U.S. Route 31 | ||||
---|---|---|---|---|
Route information | ||||
Maintained by INDOT | ||||
Existed: | 1926 – present | |||
Major junctions | ||||
South end: | US 31 at Kentucky state line | |||
I-65 near Jeffersonville |
||||
North end: | US 31 at Michigan state line | |||
Location | ||||
Counties: | Clark, Scott, Jackson, Bartholomew, Johnson, Marion, Hamilton, Tipton, Howard, Miami, Fulton, Marshall, St. Joseph | |||
Highway system | ||||
United States Numbered Highways Indiana roads
|
U.S. Route 31 {US 31) enters Indiana from Kentucky, proceeding north to Indianapolis parallel to Interstate 65, joining Interstate 465, then continuing north into Michigan.
Contents |
US 31 overlaps I-65 in Jeffersonville, after crossing the George Rogers Clark Memorial Bridge from Kentucky. It then diverges as the access frontage lanes before splitting off north of Jeffersonville at Clarksville and proceeding to Indianapolis. The stretch of US 31 that runs through Columbus is the only inter-metropolitan stretch of the route that consists of a single lane in either direction. Construction has begun to widen US 31 to two lanes in both directions for its length through Columbus.
At I-465 on the south side of Indianapolis, US 31 is routed onto I-465 to the east of the city. This is the closest approach the highway makes to downtown Indianapolis. (Previously the route of the highway through Indianapolis was on East Street, Madison Avenue, North Street, and then Meridian Street.)
US 31 exits I-465 (coincidentally at Exit 31) in southern Hamilton County, and continues northward, primarily as a divided highway. US 31 then passes through or near Kokomo, Rochester, Plymouth, and Lakeville. As US 31 approaches southern South Bend, the route becomes a full interstate-grade freeway as converges with US 20/St. Joseph Valley Parkway and proceeds west then north, bypassing South Bend and proceeding into Michigan. (See U.S. Route 31 in Michigan.)
Three sections of US 31 in Northern Indiana are being relocated or upgraded. All are part of the Indiana Department of Transportation Major Moves Project designed to convert US 31 to Interstate-grade freeway from South Bend to Indianapolis. The conversion of these over-capacity segments is expected to be completed in 2018.[1] Funding has yet to be approved for the 78 miles of US 31 located between these three segments.[2]
The New US 31 Plymouth to South Bend project will relocate US 31 on primarily new alignment from US 30 near Plymouth to US 20/St. Joseph Valley Parkway south of South Bend. Groundbreaking for the project occurred on September 17, 2008,[3][4][5] and the first portions to be completed will be overpasses at two locations, Lilac Road and Plymouth-Goshen Trail in northern Marshall County.[6] This section of highway is scheduled to open by the end of 2014.[1]
The Kokomo Corridor Project will cover 14 miles (23 km) of new highway primarily in Howard County. The new limited-access highway will be east of Kokomo and will have four interchanges at SR 26, E. Boulevard (CR 100S), US 35/SR 22 (Markland Avenue), Touby Pike and US 35 north of Kokomo. Groundbreaking for the project occurred in the afternoon of September 17, 2008, only hours after the groundbreaking for the South Bend-to-Plymouth stretch.[5][7] This section of highway is scheduled to be completed in 2013.[1][8]
The New US 31 Hamilton County project will upgrade US 31 to freeway standards from near SR 38 north of Westfield to Interstate 465 near the Marion County line and Indianapolis. Construction is to begin in 2010[6] and to be completed by 2018.[1]
County | Location | Mile[9] | Exit | Destinations | Notes | ||
---|---|---|---|---|---|---|---|
Ohio River |
0.00 | Clark Memorial Bridge | |||||
Clark |
Clarksville | 1.51 | Old SR 62 – New Albany, Clarksville, Indiana | Former SR 62 | |||
1.59 | 1 | I-65 south – Louisville | Southern end of I-65 concurrency | ||||
3.71 | 2 | I-65 north – Indianapolis | Northern end of I-65 concurrency | ||||
Jeffersonville Township | 6.16 | SR 60 west – Salem | Eastern end of SR 60 | ||||
Sellersburg | 9.28 | SR 311 south – New Albany | Northern end of SR 311 | ||||
10.02– 10.05 |
SR 403 north – Charlestown | Southern end of SR 403 | |||||
Henryville | 19.58 | SR 160 – Salem, Charlestown | |||||
Scott |
Vienna Township | 27.19 | SR 356 east – Lexington | Western end of SR 356 | |||
Scottsburg | 29.76 | SR 56 – Salem, Hanover | |||||
Austin | 34.25 | SR 256 – Madison | |||||
Jackson |
Crothersville | 37.14– 37.30 |
I-65 – Indianapolis, Louisville | Exit 36 on I-65 | |||
42.07 | SR 250 – Brownstown | ||||||
Seymour | 50.42 | US 50 – Seymour, North Vernon | |||||
Bartholomew |
Columbus | 64.86 | SR 7 – Columbus, North Vernon | ||||
65.28 | SR 46 – Columbus, Greensburg | ||||||
Taylorsville | 77.13– 77.60 |
I-65 – Indianapolis, Louisville | Exit 76 on I-65 | ||||
Johnson |
Edinburgh | 81.39 | SR 252 east – Edinburgh | Southern end of SR 252 concurrency | |||
Blue River Township | 85.11 | SR 252 west – Martinsville | Northern end of SR 252 concurrency | ||||
Franklin | 91.24 | SR 44 / SR 144 west – Martinsville, Shelbyville | |||||
Marion |
Greenwood | 107.17 | 2 | I-74 / I-465 US 36 / US 40 / US 52 SR 37 / SR 67 |
Southern and western end of I-465, I-74, US 36, US 40, US 52, SR 37, SR 67 concurrencies | ||
Indianapolis | 53 | I-65 – Indianapolis, Louisville | |||||
49 | I-74 east / US 421 south (Southeastern Avenue) - Cincinnati | Northern end of I-74 concurrency; southern end of US 421 concurrency | |||||
47 | US 52 east (Brookville Road) - Cincinnati | Southern end of US 52 concurrency | |||||
46 | US 40 east (Washington Street) - Dayton | Northern end of US 40 concurrency | |||||
44 | I-70 – Indianapolis, Dayton | ||||||
Lawrence | 42 | US 36 east / SR 67 north (Pendleton Pike) – Pendleton | Northern end of US 36/SR 67 concurrency | ||||
Indianapolis | 37 | I-69 north / SR 37 north (Binford Boulevard) – Fort Wayne | Northern end of SR 37 concurrency; southern end of I-69 | ||||
33 | Keystone Avenue – Carmel | Former SR 431 | |||||
Hamilton |
Carmel | 31 | I-465 west / US 52 west / US 421 north – Indianapolis | Western and northern end of I-465, US 52, and US 421 concurrency | |||
137.60 | Keystone Avenue – Carmel, Indianapolis | Former State Road 431; southbound exit and northbound entrance | |||||
Westfield | 140.65 | SR 32 (Main Street) – Lebanon, Noblesville | |||||
144.26 | SR 38 (Sheridan Road) – Sheridan, Noblesville | ||||||
Tipton |
Jefferson Township | 156.72 | SR 28 – Frankfort, Tipton, Elwood | ||||
Howard |
Kokomo | 166.58 | SR 26 (CR 400S) – Lafayette | ||||
170.91 | US 35 south (Markland Avenue) / SR 22 – Kokomo, Gas City | Southern end of US 35 concurrency | |||||
175.52 | US 35 north – Logansport, La Porte, Michigan City | Northern end of US 35 concurrency | |||||
Miami |
Deer Creek Township | 178.50 | SR 18 – Galveston, Marion | ||||
Pipe Creek Township | 183.73 | SR 218 east – Bunker Hill | Southern end of SR 218 concurrency | ||||
184.83 | SR 218 west – Walton | Northern end of SR 218 concurrency | |||||
Peru | 190.96– 191.71 |
US 24 – Logansport, Fort Wayne | |||||
Denver | 197.88 | SR 16 (CR 700 North) – Denver | |||||
Fulton |
Rochester | 211.58– 212.36 |
SR 25 (Main Street) – Rochester, Logansport | ||||
213.18 | SR 14 (West 18th Street) – Rochester, Winamac | No access due to grade separation | |||||
Richland Township | 221.37 | SR 110 – Mentone | Fulton–Marshall county line | ||||
Marshall |
Argos | 226.08 | SR 10 (Indiana Avenue) – Culver, Argos | ||||
Plymouth | Lincoln Highway (Old US 30) | ||||||
233.67– 234.17 |
US 30 – Valparaiso, Warsaw, Fort Wayne | ||||||
La Paz | 241.27 | US 6 – Walkerton, Bremen | |||||
St. Joseph |
Lakeville | 247.66 | SR 4 west (Pierce Road) – La Porte | Eastern end of the western section SR 4 | |||
South Bend | 262.27 | 79 | US 20 east – Mishawaka, Elkhart | Southern end of US 20 concurrency; US 31 joins the St. Joseph Valley Parkway | |||
76 | SR 23 – North Liberty, South Bend | ||||||
73 | SR 2 west (Western Avenue) – La Porte, South Bend | Eastern end of SR 2 | |||||
262.24 | 71 | US 20 west (Lincolnway West) – Michigan City, South Bend | Northern end of US 20 concurrency | ||||
263.43– 263.60 |
264 | I-80 / I-90 / Ind. Toll Rd. – Elkhart, Chicago, Toledo | Exit 72 on the Indiana Toll Road | ||||
266.02 | US 31 north – Niles, Benton Harbor | Michigan state line; St. Joseph Valley Parkway continues into Michigan | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi Concurrency terminus • Closed/Former • Incomplete access • Unopened |
U.S. Route 31 | ||
---|---|---|
Previous state: Kentucky |
Indiana | Next state: Michigan |
|